exploratory tunneling造句
例句与造句
- the region belong to high geostress area . in the preceding excavation of 4km long exploratory tunnel, several bigger flows had taken place . the maximal flux approached 4.91m3 / s and the maximal water pressure is 10.22mpa
在前期4km长探洞施工过程中,曾发生多次较大涌水,单点最大涌水量达4.91m~3s,长探洞封堵后最大水压力达10.22mpa,工程区高外水压力问题突出。 - in addition, this paper carry out successfully the support design practice in the preceding excavation of 4km long exploratory tunnel . according to the thesis research results, the following conclusion can be drawn . if the grouting rock can possess sound anti-seepage capability and the liner structure can hold higher hydraulic permeability relatively, and if the adjoining rock can be made as primary load-bearing structure by construction measure, the stability of country rock and the safety of liner structure will be guaranteed
计算结果表明,如果能使锦屏工程引水隧洞灌浆圈围岩具有较好的防渗性能,将高外水压力控制在灌浆圈以外,再配合透水性相对较好的支护结构以及排水措施,使灌浆圈围岩成为主要承载结构,并使衬砌结构和灌浆圈共同承载,是可以保证围岩的稳定和支护结构安全的。 - It's difficult to find exploratory tunneling in a sentence. 用exploratory tunneling造句挺难的